Major hospital precinct — chiller plant seismic restraint
Chilled-water pipework, pumps, and cooling towers engineered to AS1170.4 importance level 3. Compliance dossier delivered inside the head-contractor handover.
Scope
- AS1170.4 Section 8 design package for chilled-water distribution
- 450+ brace assemblies across 11 floors
- Pump skid modular framing + base isolation interface
- Certification package handover to tier-1 head contractor
Standards
- AS1170.4
- AS 3600
- AS 4100