Delivered projects

Selected case studies — where engineering meets inspection.

A representative selection. Named references are available under NDA for specifying engineers on active projects — phone the engineering team direct.

Healthcare AUS 2024

Major hospital precinct — chiller plant seismic restraint

Chilled-water pipework, pumps, and cooling towers engineered to AS1170.4 importance level 3. Compliance dossier delivered inside the head-contractor handover.

Scope

  • AS1170.4 Section 8 design package for chilled-water distribution
  • 450+ brace assemblies across 11 floors
  • Pump skid modular framing + base isolation interface
  • Certification package handover to tier-1 head contractor

Standards

  • AS1170.4
  • AS 3600
  • AS 4100
Data centre NZL 2024

Tier-III data centre — electrical & fire services

Cable tray, busway, and fire-sprinkler distribution engineered for NZS 1170.5, delivered under a compressed retrofit programme.

Scope

  • NZS 1170.5 compliance modelling
  • Cable tray + busway bracing across 3 data halls
  • Fire-sprinkler bracing coordinated with dry-pipe retrofit
  • On-site verification inspections

Standards

  • NZS 1170.5
  • AS/NZS 3000
  • NZS 4541
Commercial AUS 2023

CBD commercial tower — architectural seismic detailing

Ceiling, partition, and facade interface seismic detailing for a 42-floor commercial tower. Fabrication + certification delivered together.

Scope

  • Architectural seismic detail design
  • Facade-to-primary-structure interface fabrication
  • Ceiling grid seismic layouts across 42 floors
  • Single compliance dossier for all services + architectural scope

Standards

  • AS1170.4
  • AS 4100
  • AS/NZS 5131 CC2