About Eurofast Global
Eurofast Global was founded to resolve a specific problem: seismic restraint deliverables that fail certification because design, supply, and sign-off sit with three separate parties. We collapsed the three into one firm.
Premise
On most commercial projects, seismic restraint sits in a handover gap. The building engineer specifies "seismic restraint per AS1170.4" on the drawings. A supplier sells standard bracing. A third party certifies — or tries to. When the certifier asks for the calculation behind an assembly, the supplier points to the engineer, the engineer points to the spec, and nobody owns the working.
Eurofast was founded to remove that gap. We design the restraint, we supply the engineered assemblies, and we produce the certification dossier — from one engineering team, under one accountability.
Our values
Every recommendation is referenced to a standard, a calculation, and a tested assembly. The client does not have to take anyone's word for anything.
The restraint assembly is the vehicle. What the client buys is the compliance trail that survives the certifier, the inspector, and the builder-handover.
Design, supply, and certification flow through the same engineering team. No "that was the supplier" or "that was the designer" on handover day.
Regions
AS1170.4 Section 8. Head office. Full engineering + AU warehouse inventory.
NZS 1170.5. Higher national hazard factors — site-specific design tuned to NZ ground motion.
National Building Code of Canada. Component-level seismic restraint for services + architectural scope.
ASCE 7-22 Chapter 13. Cross-state engineering for MEP-F nonstructural components.
Send project details and region. We respond with a scoping call and preliminary compliance path within two business days.
Australia direct · 1300 271 170